2-piece Ball Valve Usage Steps

Fecha:

The long service life and maintenance-free period of a 2 Piece Ball Valve depend on several factors: normal operating conditions, maintaining a harmonious temperature/pressure ratio, and reasonable corrosion data.

Hard-seal ball valve operation steps:

1) Before operation, ensure that the pipeline and valve have been flushed.

2) Valve operation is achieved by rotating the valve stem according to the actuator input signal: a 1/4 turn (90°) in the forward direction closes the valve. A 1/4 turn (90°) in the reverse direction opens the valve.

3) When the actuator direction indicator arrow is parallel to the pipeline, the valve is open; when the indicator arrow is perpendicular to the pipeline, the valve is closed.

2-piece Ball Valve Usage Steps

Get in Touch

Contact Us

Este sitio utiliza cookies.

Utilizamos cookies para recopilar información sobre cómo utiliza este sitio web. Esta información nos permite optimizar el funcionamiento del sitio y mejorar nuestros servicios.